Employee Portal

Search
Close this search box.

Technique: Soldier Piles & Lagging Walls

Soldier Piles & Lagging Walls

Earth retention system utilized to support open excavations. Vertical steel piles are installed, and lagging is utilized between the piles horizontally to resist lateral earth pressure loads. Anchors (tiebacks) can be used with soldier piles as tension elements to resist lateral load on taller walls.

Common Applications Include: