Bridge Replacement Project – GA/SC Line, Little River. This bridge replacement project on the Georgia/South Carolina line over the Little River consisted of six (6) 96-inch-diameter drilled shafts ranging from 100 to 115 linear feet in depth. Each shaft location required drilling through approximately 30 feet (+/-) of existing concrete and rebar footing to achieve the required rock socket.
Through collaboration with Scott Bridge, it was determined that it was more cost-effective for the owner to drill through the previously constructed footings rather than demolish them and restart the foundation work. Russo installed 102-inch permanent casing through the existing concrete footings to the top of rock and installed 25-foot rock sockets.